HOME / PROJECTS / BRIDGES / BOX GIRDER / T3 BOX GIRDER BRIDGE
T3 BOX GIRDER BRIDGE
Comments: Final Design for an overpass 3 span bridge with total length 101.60m 27.05, 47.50, 27.05 has been carried out. For the deck a box girder section with 2.20m depth has been foreseen. The traffic width of superstructure is constant w=9.00m. Seismic design has been executed as per the new anti-seismic codes E39 and EC8
PROJECT DETAILS
Owner: EGNATIA ODOSComments: Final Design for an overpass 3 span bridge with total length 101.60m 27.05, 47.50, 27.05 has been carried out. For the deck a box girder section with 2.20m depth has been foreseen. The traffic width of superstructure is constant w=9.00m. Seismic design has been executed as per the new anti-seismic codes E39 and EC8