T22 FOOT BRIDGE
Construction: AKTOR
Location: Ano Liosia, Zefyri
Construction Method: Convention with temporary Formwork and Land Crane
Bridge arrangement: 6 spans reinforced concrete footbridge with total length: L=118.058m
Max span: 17.30, 18.85, 17.80, 21.74, 21.72, 16.02m
Section max width: 4.00m
Deck section: bridge section consists of concrete rectangular solid slab with dimensions: L/H 400/90cm near supports and with rectangular voids in the span
Pier section: Pier section consists of concrete rectangular solid slab with curve edges with dimensions: L/H 600/90cm
Supports: Deep Foundation through piles D=1.20m
Services: Complete Structural Design
Comments: Design has been carried out as per German codes DIN, and Greek anti seismic code E39/99.
PROJECT DETAILS
Owner: Attiki OdosConstruction: AKTOR
Location: Ano Liosia, Zefyri
Construction Method: Convention with temporary Formwork and Land Crane
Bridge arrangement: 6 spans reinforced concrete footbridge with total length: L=118.058m
Max span: 17.30, 18.85, 17.80, 21.74, 21.72, 16.02m
Section max width: 4.00m
Deck section: bridge section consists of concrete rectangular solid slab with dimensions: L/H 400/90cm near supports and with rectangular voids in the span
Pier section: Pier section consists of concrete rectangular solid slab with curve edges with dimensions: L/H 600/90cm
Supports: Deep Foundation through piles D=1.20m
Services: Complete Structural Design
Comments: Design has been carried out as per German codes DIN, and Greek anti seismic code E39/99.