Ελληνική έκδοση  English version  facebook  linked in
HOME / PROJECTS / BRIDGES / PRECAST BEAM / G7 RAILWAY BRIDGE
G7 RAILWAY BRIDGE
  • G7 bridge, constructed with the precast beam method
  • G7 bridge Ikonio
  • G7 railway bridge
  • G7 railway bridge precast beam
  • G7 bridge, prestress design
  • G7BRIDGE_PHOTO6_ALT
  • G7BRIDGE_PHOTO7_ALT
Close ( Click on the image )

PROJECT DETAILS

Owner: ERGA OSE A.E
Construction: AKTOR
Location: Ikonio
Construction Method: Using Land Crane
Bridge arrangement: 10 span bridge total length 288.20m
Deck section: with 5 precast prestressed beams with H=2.15m, and cast in situ slab 25cm
Prestress: consists of 3 cables 11T15 and 1 cable 10T15
Foundation: spread footing
Services: Complete Structural Design
Comments: Design has been done as per German Code for Railway Bridges UIC 71 and Greek ant seismic Code E39/99.