HOME / PROJECTS / BRIDGES / PRECAST BEAM / G7 RAILWAY BRIDGE
G7 RAILWAY BRIDGE
Construction: AKTOR
Location: Ikonio
Construction Method: Using Land Crane
Bridge arrangement: 10 span bridge total length 288.20m
Deck section: with 5 precast prestressed beams with H=2.15m, and cast in situ slab 25cm
Prestress: consists of 3 cables 11T15 and 1 cable 10T15
Foundation: spread footing
Services: Complete Structural Design
Comments: Design has been done as per German Code for Railway Bridges UIC 71 and Greek ant seismic Code E39/99.
PROJECT DETAILS
Owner: ERGA OSE A.EConstruction: AKTOR
Location: Ikonio
Construction Method: Using Land Crane
Bridge arrangement: 10 span bridge total length 288.20m
Deck section: with 5 precast prestressed beams with H=2.15m, and cast in situ slab 25cm
Prestress: consists of 3 cables 11T15 and 1 cable 10T15
Foundation: spread footing
Services: Complete Structural Design
Comments: Design has been done as per German Code for Railway Bridges UIC 71 and Greek ant seismic Code E39/99.