BALANCE CANTILEVER BRIDGE JRE
Construction: Arab Contractors Company (ACC) - Othman Ahmed Othman
Location: Sulaibikhat Kuwait
Construction Method: Segmentally Balance Cantilever using Land Cranes
Max span: 46.80m
Maximum pier height: 11.20m
Deck section: Precast Prestressed Box Girder Segment with constant width w=6.60m and constant depth h=2.65m. Transverse slope 2% and Curve Radius=1500m
Pier section: Rectangular Solid Section
Foundation: Deep foundation through piles diameter D=1.20m
Services: Camber Design check/Concrete Stress check/Bearing check/Construction Supervision
Comments: Prestress was a combination of External and Internal Tendons.
PROJECT DETAILS
Owner: Kuwait Ministry of Public WorksConstruction: Arab Contractors Company (ACC) - Othman Ahmed Othman
Location: Sulaibikhat Kuwait
Construction Method: Segmentally Balance Cantilever using Land Cranes
Max span: 46.80m
Maximum pier height: 11.20m
Deck section: Precast Prestressed Box Girder Segment with constant width w=6.60m and constant depth h=2.65m. Transverse slope 2% and Curve Radius=1500m
Pier section: Rectangular Solid Section
Foundation: Deep foundation through piles diameter D=1.20m
Services: Camber Design check/Concrete Stress check/Bearing check/Construction Supervision
Comments: Prestress was a combination of External and Internal Tendons.